Local

Traffic shift for I-95 Southbound drivers after the Fuller Warren Bridge

Jacksonville — A slight shift in traffic on I-95 south of the Fuller Warren Bridge has taken place, and is part of a larger project that will impact traffic every day.

FDOT says the plan is to eventually shift traffic on the Fuller Warren Bridge beginning at the Park Street ramp all the way past the San Marco Boulevard exit.  FDOT says drivers heading south will see lanes shift to the inside and that shift will create a work zone for construction crews to start expansion work on the Fuller Warren as part of the Your 10&95 project.

We told you about this shift back in November, and due to weather and other circumstances, its been pushed back multiple times due to weather and other factors.

FDOT says, as part of the project, construction crews will be adding another lane on I-95 in both directions on the Fuller Warren as well as a Shared Use Path. The path will be available for people walking or riding their bike from Riverside to San Marco, or vice versa.

FDOT is urging drivers to use caution through this area, for your safty, as well as the construction crews safty.

The Your 10&95 project is projected to be compleated by the summer of 2020.

mobile apps

Everything you love about wokv.com and more! Tap on any of the buttons below to download our app.

amazon alexa

Enable our Skill today to listen live at home on your Alexa Devices!